Pipeline architecture & fractional RevOps.
We connect your CRM and tools, clean the data and automate the handoffs, then run it for you.
What clean pipeline data moves
We build the system, then run it.
A fixed-scope project, then a monthly operator. No lock-in.
System Ops
A fixed-scope rebuild of your CRM architecture and the connections around it, so every team works from one clean dataset. Fixed price, usually 4–6 weeks. Covers one CRM and its core integrations; migrations and custom engineering are quoted separately.
Book a diagnostic call- Stage gates: required fields and rules, so deals can't skip steps
- Routing and dedupe: territory and round-robin rules that stop lead leakage
- Integrations: the CRM connected to your billing, support and marketing tools, with no re-keying
- Automation: handoffs, alerts and follow-ups that run without reps
- Three dashboards on one set of metric definitions: leadership, pipeline, rep activity
- Recorded walkthrough and workflow docs
RevOps Operator
CRMs decay once an implementation ends: ad hoc picklists, broken syncs, routing that quietly stops. We own stages, routing, automation and data quality month to month. No lock-in, and the runbook is updated monthly.
Book a diagnostic call- Weekly deal-rot scans: stale deals, past-due close dates, weighted forecast
- Sync and automation monitoring, including Deluge scripts and Zaps, fixed before records orphan
- Change control for properties, stages and user seats
- Alignment as the team, comp plans and pricing change
- A living runbook, updated monthly
Which problem sounds like yours?
Select one to see the cause and the fix.
System Ops: connect the CRM to the tools around it and set one definition per metric.
Scope this fixWhat your leadership says. What the data shows.
| What they say | What the data shows | The fix |
|---|---|---|
| Sales leader"Reps won't log activity." | Stage exit needs 18 manual fields, with no automated capture. | Cut 80% of manual inputs. Log from inbox and calendar. |
| Founder"We need a new CRM." | The schema has no validation rules. A migration just exports the clutter. | Audit the schema, merge duplicate objects, keep your tools. |
| Head of CS"Customers arrive with no context." | Closed-Won deals don't carry scope, contacts or terms into the success pipeline. | Required handoff fields and an automatic onboarding task. |
| Board / investors"The forecast keeps swinging." | Deals sit in active stages past realistic close dates, with no decay rules. | Deal-rot flags and quarterly close-date locks. |
Swipe to see the full table →
Four steps. Fixed scope.
Diagnostic call
30 minutes on your CRM, pipeline and connected tools. We say whether you need System Ops, RevOps Operator or both.
Scoped proposal
Fixed price for System Ops. Fixed monthly scope for RevOps Operator. No open-ended billing.
Build and staging
Built in a sandbox. Production cutovers happen outside business hours.
Handoff
A written runbook and recorded walkthrough. Run it yourself, or keep us on month to month.
Common questions
System Ops is a fixed-scope rebuild, usually 4–6 weeks. RevOps Operator is the monthly retainer that keeps the system clean. Most teams start with System Ops, then keep RevOps Operator.
HubSpot, Zoho (CRM, Books, One) and Salesforce, connected to the rest of your stack through native integrations, Zapier and Make. We fit your stack; we don't push a platform.
Rarely. Our work is systems, data and automation inside the tools you already use. If something needs real engineering, we scope it separately and say so up front.
No. It runs month to month with no lock-in, and the runbook is updated monthly so you can bring it in-house or stop whenever you choose.
Sometimes you should. A fractional operator starts on day one at a fraction of the cost and leaves documentation either way. Many teams stabilise with us, then hire into a clean setup.
Both. We work on East Africa Time (GMT+3): full overlap with the UK and Europe, 3–4 morning hours with the US East Coast.
Yes. We audit legacy workflows, Zaps and custom scripts (including Zoho Deluge), fix timeouts and API-limit failures, and document what a previous RevOps person left behind.
Inside your existing tools by default. In roughly 70% of audits, fixing the schema in place is faster and cheaper than migrating.
System Ops runs 4–6 weeks; the first two are read-only audit and staging. RevOps Operator runs month to month and starts with an audit. Live cutovers happen outside business hours.
Book a 30-minute diagnostic.
We review your CRM, pipeline and connected tools, then tell you what to fix first.